Roberto3133 Roberto3133
  • 22-01-2024
  • Engineering
contestada

Who on site is responsible for the assembly or disassembly of a crane?
a. Crane operator
b. Site supervisor
c. Certified rigger
d. Qualified person

Respuesta :

Otras preguntas

215% OF 41.8 IS WHAT?
The width of a triangle is 6 cm less than its length. If it's perimeter is 80 cm then it's lengths and area are respectively
The melting points of canola oil, corn oil, sunflower oil, and peanut oil are 10°C, –11°C, –17°C, and –2°C. If you cool a mixture of these oils to 5°C, which o
The sum of twice a number and 10 is 36
Which of the following is correct assuming that the crash victim not the officer is the person who is bleeding heavily Bleeding heavily, the officer who arrive
Is it true that any four points are contained in exactly one plane
A meter is an SI unit. Which quantity might you measure in meters?
What is X ? 15: .5 :: X :15
720 pt/h= ? qt/min please show step by step
explain why it is important to follow the order of operations when evaluating 15+3x4