driscollr7707 driscollr7707
  • 26-02-2024
  • Mathematics
contestada

p can do a piece of work in 50 days, q in 40 days and r in 30 days respectively. If r is assisted by p on one day and by q on the next day alternately then the work gets complete?
o 17 32/35 days
o 19 ⅔ days
o 16 31/37 days
o 16 31/37 days

Respuesta :

Otras preguntas

Which statement best describes the pH of pure water a. It is neutral because the concentration of hydronium ions equals that of hydroxide ions b. it is neutra
Deduce how two genes for different traits that are on the same chromosome can fail to be inherited together.
how can you tell that a website is valid and reliable
12b−15>21?? How is this done? Need help ASAP
What is a preposition
Consider the unbalanced equation for the combustion of hexane: 2C6H14(g)+19O2(g)→12CO2(g)+14H2O(g)Determine how many moles of O2 are required to react completel
what is the answer to this question a bicyle rides 14 miles in 122 mins if she continues at this speed ,how long will it take to travel in 35 miles plzz answer
how do I do this? 4/5x>14
Which occurs when two fluorine atoms react to produce a fluorine molecule? (1) Energy is absorbed as a bond is broken. (2) Energy is absorbed as a bond is forme
What factors play a role in population growth rate?