Looking at costs associated with quality, the following pro-active measures (costs of inspectors, testing, test equipment, and labs) are examples of ________.
1) Preventive costs
2) Appraisal costs
3) Internal failure costs
4) External failure costs

Respuesta :

Otras preguntas

what is 2 3/100 in a decimal
Which is a characteristic of the "invasion novel"?
1) What were the Tools of Empire Building
What is 5 times 5 equal
Julio served in the war in Iraq and was severely traumatized when a rocket-propelled grenade exploded next to his Humvee. Recently, Julio was studying in the li
8) Write the correct name for the given compounds. Spelling counts! (1 point each) a) S2CL2 b) HF c) C1207 d) H2SeO4 e) Cd3(PO4)2
Until recently, Visual Electronics manufactured Blu-ray players on an assembly line with each worker performing only one simple task. Three months ago, the comp
Which summaries should be written in chronological order?
A car with a mass of 600 kg is traveling at a velocity of 10 m/s. How much kinetic energy does it have? The car has J of kinetic energy
Which is an example of continuous data? A) amount of snowfall in a blizzard B) number of students who pass a math quiz C) number of languages an individual sp