johnka37 johnka37
  • 24-05-2018
  • Mathematics
contestada

If a job can be completed in 4 hr, then the rate of work is __ of the job per hour.

Respuesta :

hhong2021 hhong2021
  • 24-05-2018
1 divided by 4 is 0.25 or 1/4
Answer Link
mmpeachey107
mmpeachey107 mmpeachey107
  • 24-05-2018
To find the rate of work, split up the hour by 4. So, 1 divided by 4.  This makes .25 (also written as 1/4).  So the rate of work is 1/4 of the job per hour.

Hope this helps! Can I have Brainliest? :)

Answer Link

Otras preguntas

what is the effect of shape on the density of samples of the same material?
An atom that loses or gains electrons is called anA. Isotopes B. Proton C. NeutronD. Ion
Convert 3.5 ⋅ 10^4 to standard form.
in the 2010 new york city marathon 42429 people finished the race and received a medal before the race the medals had to be ordered if you were the person in ch
witch is bigger 3 7/9 or 3 10/12
Ayer nosotros ______ en un restaurante famoso. (3 points) Question 3 options: 1) comemos 2) comimos 3) comen 4) comeremos ¿Qué ____________ tú en el mercado
3+0.3+0.009 standard
what is the estimate for the sum of 474
which phrase describes popular sovereignty? a. consent of governed b. government by the few c. government by the few d. rule of law
In what area of Africa did the early Bantu originate?