Qn.11 plz help this with step ​

Qn11 plz help this with step class=

Respuesta :

salatulmaghrib
salatulmaghrib salatulmaghrib
  • 25-07-2019
The answer is 7.5 days
explanation:
80 is four times 20.
80 people should be able to do the job four times faster than 20 people.
So, they should take 1/4 the time.
If 20 people take 30 days, 80 people should take 30/4=7.5 days.
**
simpler explanation:
30*20/80=7.5
Answer Link

Otras preguntas

If 24 extra large cans of soup will serve 96 people, how many cans should Ann buy to serve 28 people
There are six basic types of population pyramids. True False
Pe lingNeed 2 yards of fabric for a craft project she has 3 feet already how many inches of fabric does she need still need
What type of mutation causes sickle-cell anemia A): Deletion B):Insertion C): Frame shift D:) Substitution
How many obtuse angel does the triangle have
3m-4n-7 8m+n-6 Subtract the following polynomials
What is the quadratic regression equation for the data set? A. yˆ=0.056x2+1.278x−0.886 B. yˆ=0.056x2+1.278 C. yˆ=0.056x2+1.278x D. yˆ=0.056x2−1.278x−0.886
In december 2012, hsbc, a european bank operating within the united states, was found to be involved in money laundering and terrorist financing on a very large
How does rule of law apply in your daily life?
Which is the area of a triangle with a base of 8 inches and a height of 6 inches? A. 14 square inches B. 24 square inches C. 48 square inches D. none of the abo