tomgikaria tomgikaria
  • 21-04-2020
  • Physics
contestada

A crane lifts a 400 N crate full of baked beans 15 m. How much work was done by the crane?

Respuesta :

muhammadtalhabinyous
muhammadtalhabinyous muhammadtalhabinyous
  • 21-04-2020

Answer:

6000 J

Explanation:

work = F x S

work = 400 x 15

work = 6000 J

Answer Link

Otras preguntas

What is this in the shape of a form
The Judiciary Reorganization Bill of 1937 - often called the "Court-Packing Bill" - is notable in FDR's New Deal because it A) suggested that aging Supreme Cour
A woman with type A blood (AA) and a man with type B blood (BO) have a baby. What is the chances the baby will have type B blood? 75% chance 25% chance 50% c
Solve by substitution y=-2+10
Pedro wants to create a chemical reaction between oil and water. He adds oil to a beaker of water and notices that the liquids do not mix. He then shakes the be
A party-favor bag must have a volume of 140 cubic inches and the dimensions that are shown below. The equation x^3+6x^2-27x=140 can be used to find x. height(
Does anybody know a good quote. I need it for english
Paul Peddler wants to purchase a bicycle costing $775. If he choses to make 12 equal payments, then in dollars and cents the average payment will be? A) 15.48
which of the following universal forces is the most effective over long distances? A. Electric B. Gravitational C. Magnetic D. Strong nuclear
1.) What conditions are necessary for a lunar eclipse to occur? the moon is earths shadow earth is in the moons shadow the moon is in the suns shadow the sun i