waylonjohnson32
waylonjohnson32 waylonjohnson32
  • 22-04-2020
  • Computers and Technology
contestada

Chris is a project manager. He would like to schedule a status meeting for the next week. Several of the group members work at another site. What should Chris do?

Respuesta :

6mrpll
6mrpll 6mrpll
  • 22-04-2020

Answer:

chris should make a website for everyone

Answer Link
cadencenterstage cadencenterstage
  • 11-05-2021

Answer:

set up a meeting and conference call and send the phone number and pass code to the attendees

Explanation:

edge 2021 , have a great day!

Answer Link

Otras preguntas

A leaf's stomata _____. contain chlorophyll are part of the spongy layer open and close to control evaporation protect the leaf from physical damage
Which statement best describes the differences in goals and methods between W.E.B. DuBois and Booker T. Washington? A. DuBois felt that education wasn't that
The black arrow in the picture above is pointing to an organelle that is packaging and shipping substances out of a cell. What is this organelle? a. nucleus b.
whats992,449 rounded to the nearest hundred thousand
Proper citation methods present A. a way for your readers to retrace your steps in the research process. B. shorter, more concise documents. C. clarity in descr
Which is the most common safety rule to follow before leaving the lab?
how to write 8x18=144 using the distributive property
what is 1/2x1/3 in simplest form
60×4=____tens×4=__tens=___
5x2y and 7xy2 are like terms?