michellemorrison
michellemorrison michellemorrison
  • 23-04-2020
  • Mathematics
contestada

If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines

Respuesta :

2020hw
2020hw 2020hw
  • 23-04-2020

Answer:

60 workers

Step-by-step explanation:

4 machines= 12 workers

20 machines= 60 workers

You multiply by 5

Answer Link

Otras preguntas

whats the difference between diabetes type 1 and type 2?
What changes in thought brought about scientific revolution
How many oz are in 3/8 lb.
Consider P(x) = x4(x − 2)3(x + 1)2. What are the zeros of the function? What is the multiplicity of each zero?
In my class we were watching a movie. The teacher gave us a review worksheet and she asked: Do you think the world will end this year? True or False. Why or Why
To access your course materials such as reading assignments,textbooks, and other lesson content,it would be best to go to the
Why do scientists say the genetic code is similar to all living organisms?
Solve the system of equations by elimination and identify which could be a first step of the elimination method for the system. 2x – 3y = 6 3x – y = 2
A mailman performed 296 J of work lifting a box of 1.6 m. How much force did the mailman use?
Why is Barbados so foreign to the narrator?