Mark can dig a ditch in 4 hours. Greg can dig the same ditch in 3 hours. How long would it take them to dig it together?

Respuesta :

StarVAng
StarVAng StarVAng
  • 24-07-2020

Answer:

1 hour and 43 minutes

Step-by-step explanation:

Add both of theyre work hours together you get 3/12 and 4/12

Then you add both 3/12 4/12

You get 7/12

They complete the job 12/7 hours =1 5/7 (1 hour 43minutes)

Answer Link
brynnxin brynnxin
  • 04-02-2022

Answer:

1 5/7

Step-by-step explanation:

Answer Link

Otras preguntas

According to this map, which nation is considered part of northern and western Europe? > Austria Norway Greece Portugal
True orr fale the bill of rights limits the power of government and protects the rights of individuals
Kong took 15% fewer seconds than Nolan took to complete his multiplication timed test. Kong took 85 seconds. How many seconds did Nolan take?
When you review mr. f's fluid intake and output, how does his body appear to be adjusting his fluid levels?
Which is equivalent to ? please wait till i add my picture
1. Read the passage and answer the question.. Georgia always awoke at 7:00 A.M. Her morning routine always went in the same order, and her friends and family co
What are the two ways you are born with immunity after you are born?
What is the simplified form of x minus 5 over x squared minus 3x minus 10 ⋅ x plus 2 over x squared plus x minus 12? 1 over the quantity x minus 3 times the qu
What is mMHJ? Please help
Endnotes into a document are automatically positioned at the bottom of the page where the endnote reference is inserted. True False