jimit jimit
  • 22-11-2020
  • Engineering
contestada

How does a project differ from an ongoing work effort?

Respuesta :

anjelojay4
anjelojay4 anjelojay4
  • 22-11-2020

Answer:

Projects have a fixed budget, while operations have to earn a profit to run the business. Projects are executed to start a new business objective and terminated when it is achieved, while operational work does not produce anything new and is ongoing.

Hope this helped!

Answer Link

Otras preguntas

what is unit ratio?
What is equivalent to 11 - ( 3 5/8
8 to the power of 15 over 8 to the power 13 simplified
Propeller rings guards and baskets are designed to do what
John and Abel each had a cup of ice cream. John ate 1/4 of the cup of ice-cream and Abel left just 1/4 cup of ice-cream from his cup. How much more did Abel eat
What is the name of a mass that is 10-6 smaller than a gram?
The pharaoh Ahmose drove the Hyksos out of Egypt and restored Egyptian rule, leading to a time period in Egyptian history called the
What is the answer to the equation -2+-5=
In “The Wife’s Lament,” the wife assumes her husband is now a. on an exciting adventure and does not think of her. b. on his way home for a reconciliation. c. m
When did the war change from a battle over preserving the union to a war to end slavery