briannamartinez143
briannamartinez143 briannamartinez143
  • 24-11-2020
  • Mathematics
contestada

A large snowplow can clear a parking lot in 5 hours. A small snowplow needs 8
hours to clear the lot. Working together, how long would it take them to clear the
lot?

Respuesta :

nhill061925 nhill061925
  • 24-11-2020

Answer:

16.5 I think

Step-by-step explanation:

can you let me know if you are working on finding averages right now? Bc if so the answer I gave is right bc I just did the average of the two.

Answer Link

Otras preguntas

If u get 2 points every 5 minutes, how long will it take to get 1,000 points?
Learning to control aggressive behaviors is important for children's _____ health. Group of answer choices mental or social-emotional cognitive physical epigene
Which statement is true about the graphs of the two lines y=-8x-5/4and y=1/8x+4/5?
Need help with this question (pic included)
Which organization is an interest group?
WHICH INEQUILITY IS EQUIVALENT TO X-4<9
Express ratio 3.5:14 as 1:n
Graph g(x)=|x−4|+3.\
Drive 0101 0102 0103 0104 0105 0106 0107 0108 0109 0110 0111 0112 0113 0114 0115 0166 Sorting Minute True 102 162 165 91 103 127 112 137 102 147 163 109 91 107
A rug is in the shape of a square. It measures 18 feet on each side. What is its perimeter?