TyreeSerini163 TyreeSerini163
  • 24-03-2014
  • Mathematics
contestada

Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Respuesta :

madankapoor10
madankapoor10 madankapoor10
  • 24-03-2014
1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Otras preguntas

¿Cuál es la idea principal del pasaje? gastar dinero en ropa la ropa de marca el estilo de ropa la apariencia física
An experiment was designed to test the hypothesis that the pesticide Cycick would eliminate scorpion egg production The results of the experiment are shown in t
Which emerged as a nodal point of trade and administration during the Chola period? A. Temples B. Markets C. Pattanams D. Ur
how do you see your self​
84-24 24x84 84x24 plz help me
at the beginning of the sound of thunder does it take place in the past present or future? how do we know?
Copper (Cu) reacts with sulfur (S) to form copper sulfide as shown in the equation. A scientist adds 12.7 grams of Cu to 3.2 grams of S to start the reaction. I
What happened after the Jews rebelled against the Romans in 132 C.E?
The product of a rational and irrational number is _____ rational
Select all the true statements about the angles in the figure.