NOTKNOWING NOTKNOWING
  • 25-10-2021
  • Mathematics
contestada

How long would it take eight lumberjacks to chop down eight trees at the same rate?

Respuesta :

Gervy
Gervy Gervy
  • 25-10-2021

Answer:

4 hours

Step-by-step explanation:

It take them 1.5 h ÷ 0.5 h to chop down 1 tree, so it would take 0.5 h × 8 = 4 hours to chop down 8 trees

Answer Link

Otras preguntas

What stimulates the release of parathyroid hormone (PTH)? (A) low basal metabolic rate (B) hypocalcemia (C) cold temperatures (D) hypercalcemia
In what way do anatomy and physiology differ? a. Anatomy involves the study of the structures of the body while physiology involves the study of the function o
Find the dimensions of the open rectangular box of maximum volume that can be made from a sheet of cardboard 3131 in. by 1717 in. by cutting congruent squares f
Escoge la frase que es cietra
A company is setting its direct materials and direct labor standards for its leading product. Direct material costs from the supplier are​ $9 per square​ foot,
Can you put these cats in the right order (from Largest to Smallest) according to their actual real-life size?
A cylinder has a height of 16cm and a radius of 5cm. A cone has a height of 12cm and a radius of 4cm. If the cone is placed inside the cylinder as shown, what i
Bile from the liver emulsifies _____________.
where did most immigrants come from in 1920? in 2000?​
The assumptions made are: The gas molecules from Caesar's last breath are now evenly dispersed in the atmosphere. The atmosphere is 50 km thick, has an avera