Government officials and concerned citizens would be classified as _____ project stakeholders.

Respuesta :

shrookwage
shrookwage shrookwage
  • 25-11-2017
the answer would be External
Answer Link

Otras preguntas

a large country economically and politically dominating a smaller country
what is a percentage increase of 19.50 to 22.50
The first factories in America produced __________. A)textiles B)gunpowder C)shoes D)iron tools
In biological systems most of the original energy from the sun is lost as? A. Light B. Kinetic energy of motion C. Heat D. Potential chemical energy
The Western Church claimed authority over the Eastern Church because the Pope? a. wanted the Eastern Church to remain Christian. b. wanted the Eastern Church to
Out of sugar solution, salt solution , muddy water and milk choose the colloid solution. what kind of colloid solution it is?
What theory holds that the social culture is not totally determined by the environment? A. Environmental Determinism B. Environmental possibilism C. Geomorpholo
what is the difference between the smallest six digit number and the greatest four digit number
a child weighing 24 kg requires Epilim at a dose of 20 mg per kg.How much should be given?
The first factories in America produced __________. A)textiles B)gunpowder C)shoes D)iron tools