In a pert​ chart, the​ _______ path is the most​ time-consuming set of tasks in a project.

Respuesta :

LearnGrow
LearnGrow LearnGrow
  • 13-03-2018
The PERT chart is As diagram that depicts the sequence of activities needed to complete a project. Also it represents the time or costs associated required for each project activity.
In a PERT chart, the​ critical path is the most​ time-consuming set of tasks in a project. The c
ritical Path Analysis schedules and manages complex projects.
Answer Link

Otras preguntas

the rise of the roof is 8 the span is 30 the pitch of the roof is the ratio of the rise to the half span. if rise is 8ft and the span is 30ft what is the pitch
what adaptions allow lions to hunt at night?
In an elastic collision, an object with momentum 12 kg·m/s collides with another. the final momenta of each are 14 kg∙m/s and 16 kg∙m/s respectively. what was t
which number is the solution of m+91=157 ( a:58 , b:66 , c: 68 , d: 248 )
Franklin deposited $75 in a no-interest back account when he opened it. After that, he deposits $50 per month in the account. Assume he makes no other withdrawa
what is the opposite of zero on a number line
what is the value of the expression 3.2(2.3)-4.8
With which statement would stalin and churchill most likely agree?
Jaime had $37 in his bank account on Sunday. The table shows his account activity for the next four days. What was the balance in Jaime’s account after his depo
what are the three consecutive even integers that add up to 156